Nam Khan hydropower project
Detailed introduction
| Product | Nam Khan hydropower project |
| Client's name | SINOHYDRO Corporation Limited |
| Project location | Nam Khan, about 30km away from Chiang Thong |
| Device | 15 tons/hour integrated water treatment system; 1 ton/hour buried sewage treatment system. |
| Project highlights | 1. Surface water treatment meets the drinking water standard of the host country. 2. Adopting buried biochemical treatment method, the domestic sewage is discharged after meeting the environmental protection requirements in the host country |
