Case details
Xusheng Environmental Technology
Nam Khan hydropower project
Detailed introduction
Product | Nam Khan hydropower project |
Client's name | SINOHYDRO Corporation Limited |
Project location | Nam Khan, about 30km away from Chiang Thong |
Device | 15 tons/hour integrated water treatment system; 1 ton/hour buried sewage treatment system. |
Project highlights | 1. Surface water treatment meets the drinking water standard of the host country. 2. Adopting buried biochemical treatment method, the domestic sewage is discharged after meeting the environmental protection requirements in the host country |
旭晟环境科技
Xusheng Environmental Technology
HOME | 360° SERVICE | CASES | PRODUCTS | ABOUT US | NEWS | CONTACT | 中文版
Copyright(C)2022, Jiangsu Xusheng Environmental Technology Co., Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 备案序号:苏ICP备14029194号